Skip to main content

Current Public Tenders

When public tenders become available, we post the details below. Please view the applicable PDF for more information.

University of Waterloo ESC 3rd Floor Renovation

200 University Ave. W

The intent for the renovated 3rd floor is to relocate the existing central corridor to the exterior wall of the 3rd floor and create 8 new research laboratories with a total of 56 new low flow fume hoods. Support research space and admin area are incorporated into the design to support the labs. Building envelope upgrades are incorporated into the design including a new roofing system, standalone heat pump HVAC system, upgrades to the exterior walls and replacement of the existing single pane windows. The net area of work associated with this renovation is 23,777 square feet (2,208 m2), with selected scope on the basement, second floors, roof, penthouse and new buffer tank addition. Programme elements include 8 new laboratories, research spaces, meeting rooms and teaching spaces, offices, a new corridor, and new washrooms. Scope of renovation to include abatement of asbestos and other designated substances.

Closing:

Thurs February 16, 2023
@2:00pm

View PDF