Philip Square

Waterloo, ON

New Four Tower Student Complex

This large-scale four-tower student complex will mark the completion of a nearly decade-long project with the JD Development Group. With site demolition beginning in 2013, these 20 storey structures were built in four phases and arranged around a central courtyard. The two street-facing buildings have retail and commercial space on the ground floor. When complete, this project will house 2,000 residents per building in a mix of three, four and five-bedroom units. Included is street-level and underground parking for more than 550 vehicles. The entire complex is scheduled to be completed by 2022.

Phillip Square includes many amenities to suit the needs of students. Common areas include lounges with fireplaces and flat-screen TVs, large quiet shared study areas, fitness centres, WiFi, open-view security-controlled laundry facilities in the main lobbies, and a movie theatre. Underground parking and secure bicycle storage are also available.

Outside the four-tower complex, residents can enjoy the use of a basketball court, open patio deck, benches, and paths for relaxing and staying active with friends and neighbours. Ground floor retail areas are directly accessible by elevator to Blair and Elora House residents.

Blair House (Tower A)

Project Duration: January 2014 - September 2015
Building Size: 18,214 m²
Value: $24,800,000
Units: 106
Contract Type: Construction Management
Consultants: McKnight Charron Limited Architects,
EMCAD Consulting Engineers, Stephenson Engineering Ltd.

Fergus House (Tower C)

Project Duration: December 2015 - August 2017
Building Size: 19,523 m²
Value: $ 28,332,000
Units: 119
Contract Type: Construction Management
Consultants: McKnight Charron Limited Architects,
EMCAD Consulting Engineers, Stephenson Engineering Ltd.

Hespler House (Tower D)

Project Duration: September 2017 - September 2020
Building Size: 19,523 m²
Value: $ 30,900,000
Units: 119
Contract Type: Construction Management
Consultants: McKnight Charron Limited Architects,
EMCAD Consulting Engineers, Stephenson Engineering Ltd.

Elora House (Tower B)

Project Duration: June 2020 - September 2022
Building Size: 18,214 m²
Value: $31,900,000
Units: 107
Contract Type: Construction Management
Consultants: McKnight Charron Limited Architects,
EMCAD Consulting Engineers, Stephenson Engineering Ltd.


Consultants

IBI Group, McKnight Charron Laurin Inc. Architects, EMCAD Consulting Engineers

Sector

Multi-Unit Residential

Project Duration

January 2014 - September 2022

Size

300,000 sq.ft.

Value

$115,922,000

Project Type

Construction Management

Client

JD Development Group